Home
Overview
Links

Empennage
Inventory
Vertical Stabilizer
Rudder
Horizontal Stabilizer
AirVenture 2006
Horizontal Stab. Cont.
Elevators
Elevators Part 2
Tailcone

Wings
Main Spar
Main Ribs
Rear Spar/Top Skins
Leading Edges
Fuel Tanks
Fuel Tanks continued
Ailerons
Flaps

Fuselage
25-26:Getting Started
27:Firewall
28:Forward Ribs/Skins
29:Fuse Side Skins
30-31:Steps, Fwd Fuse
32-33:Tailcone, Baggage
34-35:Baggage Door, Etc.
36-37:Brake & Fuel Lines

Finishing Kit
38-39:Brake/Rudder Pedals
40-41:Flaps/Fwd Fuse
42:Cabin Top
Instrument Panel
43:Cabin Cover
45:Doors
Overhead Console
45:Doors (cont)
Door Latch
More Door Work
Landing Gear
Misc. Stuff
Panel Work
Wingtip Lights
Cowl Work
Baffling
Intake
Wing Work
Empennage Tips
Empennage Attach
Wing Attach
Rigging
Final Prep Work
More Final Prep
Gear Fairings
Inspection and First Flight

Firewall Forward
Engine Installation

Systems
Instruments
Antennas
Wiring


Previous: Engine Installation

   

8/15/10-1/23/11 - Misc. - 200 hrs

I haven't been too good at updating this construction log lately, but here's a quick retrospective of what I've been up to since August.

First, I finished riveting the aft fuselage. There wasn't much to take pictures of during this process.

Next, I painted the interior and the inside of the cabin top. It is tough for me to take pictures while painting for obvious reasons.

 

 

   

I bonded the aft windows into the cabin top. I haven't cleaned up the joints yet.

 

   

I hooked up the aft air vents and the compass module for the AFS4500.

 

   

The electrical system is progressing.

 

   

I installed the forward fuselage.

I also installed the instrument panel.

 

   

Here is my cool start switch. It is wired to the VP200 and it will light up when it is active.

 

   

I installed the cabin heat cables.

 

   

Here you can see the center section of the Aerosport Products instrument panel. I have installed the VP200 display in this area.

 

   

Firewall: I have wired the sensors to the engine.

 

   

Here are the cables for the heat controls.

 

   

I made a bracket to hold the Garmin GPS antenna.

 

   

The ground strap to the engine is installed.

 

   

This is a dark picture, but it shows the overhead console with the vents and the lights.

 

   

Oh, and here is where I installed the flap sensor. It will eventually be enclosed by the wing gap fairing.

So that's where I'm at.