Finishing Kit 38-39:Brake/Rudder Pedals 40-41:Flaps/Fwd Fuse 42:Cabin Top Instrument Panel 43:Cabin Cover 45:Doors Overhead Console 45:Doors (cont) Door Latch More Door Work Landing Gear Misc. Stuff Panel Work Wingtip Lights Cowl Work Baffling Intake Wing Work Empennage Tips Empennage Attach Wing Attach Rigging Final Prep Work More Final Prep Gear Fairings Inspection and First Flight
Firewall Forward Engine Installation
Systems Instruments Antennas Wiring
Previous: Intake
10/19/11 - 12/26/11 - Wing Work - 40 hrs