Home
Overview
Links

Empennage
Inventory
Vertical Stabilizer
Rudder
Horizontal Stabilizer
AirVenture 2006
Horizontal Stab. Cont.
Elevators
Elevators Part 2
Tailcone

Wings
Main Spar
Main Ribs
Rear Spar/Top Skins
Leading Edges
Fuel Tanks
Fuel Tanks continued
Ailerons
Flaps

Fuselage
25-26:Getting Started
27:Firewall
28:Forward Ribs/Skins
29:Fuse Side Skins
30-31:Steps, Fwd Fuse
32-33:Tailcone, Baggage
34-35:Baggage Door, Etc.
36-37:Brake & Fuel Lines

Finishing Kit
38-39:Brake/Rudder Pedals
40-41:Flaps/Fwd Fuse
42:Cabin Top
Instrument Panel
43:Cabin Cover
45:Doors
Overhead Console
45:Doors (cont)
Door Latch
More Door Work
Landing Gear
Misc. Stuff
Panel Work
Wingtip Lights
Cowl Work
Baffling
Intake
Wing Work
Empennage Tips
Empennage Attach
Wing Attach
Rigging
Final Prep Work
More Final Prep
Gear Fairings
Inspection and First Flight

Firewall Forward
Engine Installation

Systems
Instruments
Antennas
Wiring


Previous: Rigging

   

3/29 - Move

In March we got kicked out of our hangar, so we had to quickly find someplace else to put the plane.

As it turns out the city had a hangar available and it was the same hangar we were in when I finished up the -9a.

So on the last Saturday of March we packed up everything and moved to the new hangar.

 

   

Goodbye new hotness hangar...

 

   

The line guys were kind enough to give me a lift to the new hangar since the plane is not yet able to move under its own power. They showed up with the John Deere and off we went.

 

   

She looks really nice moving, even if being towed.

 

   
 
   
 
   

Hello old and busted hangar.

 

   

5/3 - 5/16/2014 - 30 hours

 

   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   

Next: More Final Stuff