Home Overview Links
Empennage Inventory Vertical Stabilizer Rudder Horizontal Stabilizer AirVenture 2006 Horizontal Stab. Cont. Elevators Elevators Part 2 Tailcone
Wings Main Spar Main Ribs Rear Spar/Top Skins Leading Edges Fuel Tanks Fuel Tanks continued Ailerons Flaps
Fuselage 25-26:Getting Started 27:Firewall 28:Forward Ribs/Skins 29:Fuse Side Skins 30-31:Steps, Fwd Fuse 32-33:Tailcone, Baggage 34-35:Baggage Door, Etc. 36-37:Brake & Fuel Lines
Finishing Kit 38-39:Brake/Rudder Pedals 40-41:Flaps/Fwd Fuse 42:Cabin Top Instrument Panel 43:Cabin Cover 45:Doors Overhead Console 45:Doors (cont) Door Latch More Door Work Landing Gear Misc. Stuff Panel Work Wingtip Lights Cowl Work Baffling Intake Wing Work Empennage Tips Empennage Attach Wing Attach Rigging Final Prep Work More Final Prep Gear Fairings Inspection and First Flight
Firewall Forward Engine Installation
Systems Instruments Antennas Wiring
Previous: Airworthy
8/11/2015 - Painted!
Here are some pictures from last week when I picked up the plane from GLO Custom in Roanoke, TX.
Fitting two RV-10s into a 60 foot T-hangar is a bit tricky.