Home
Overview
Links
Empennage
Inventory
Vertical Stabilizer
Rudder
Horizontal Stabilizer
AirVenture 2006
Horizontal Stab. Cont.
Elevators
Elevators Part 2
Tailcone
Wings
Main Spar
Main Ribs
Rear Spar/Top Skins
Leading Edges
Fuel Tanks
Fuel Tanks continued
Ailerons
Flaps
Fuselage
25-26:Getting Started
27:Firewall
28:Forward Ribs/Skins
29:Fuse Side Skins
30-31:Steps, Fwd Fuse
32-33:Tailcone, Baggage
34-35:Baggage Door, Etc.
36-37:Brake & Fuel Lines
Finishing Kit
38-39:Brake/Rudder Pedals
40-41:Flaps/Fwd Fuse
42:Cabin Top
Instrument Panel
43:Cabin Cover
45:Doors
Overhead Console
45:Doors (cont)
Door Latch
More Door Work
Landing Gear
Misc. Stuff
Panel Work
Wingtip Lights
Cowl Work
Baffling
Intake
Wing Work
Empennage Tips
Empennage Attach
Wing Attach
Rigging
Final Prep Work
More Final Prep
Gear Fairings
Inspection and First Flight
Firewall Forward
Engine Installation
Systems
Instruments
Antennas
Wiring
|
Painted!
Click to see the latest entry
Current Status as of 8/17/15
Disclaimer: This site chronicles the construction of my experimental aircraft for my own educational and entertainment purposes. The processes and procedures described herein should not be used as instructions on building any aircraft. |
|
RV-9A Project
CNC Router
AirVenture 2006
|